Appointment of Project Manager led Integrated Consultant Team for Carrickfergus City Deal Project

71000000: Architectural, construction, engineering and inspection services

Contract details

Detailed information about the contract

Id
T422
Title
Appointment of Project Manager led Integrated Consultant Team for Carrickfergus City Deal Project
Description

Mid and East Antrim Borough Council wish to appoint an Economic Operator to provide a Project Manager led Integrated Consultant Team (ICT) for the design and delivery of the Carrickfergus City Deal Project. The project is set to regenerate, reposition and rebrand the town of Carrickfergus as an authentic heritage led tourism hub and the gateway to the Causeway costal route. The project includes developing the Castle and Historic Walls, a new visitor centre, refurbishment of the radar tower, public realm, road infrastructure works, interpretation and lighting scheme with a development cost of circa £40m The Economic Operator will be appointed under the NEC4 Professional Service Contract and shall provide the professional services applicable to RIBA Plan of Work (2020) Stages 2 to 7 and as specified in the PQQ and ITT documents. ICT shall develop the design to RIBA Plan of Work (2020) Stage 4a before appointing an Integrated Supplier Team (IST) to complete the design and deliver the project throughout all remaining RIBA Plan of Work (2020) Stages 4b to 7. Following the procurement and appointment of the IST the Economic Operator shall undertake the management of the IST on behalf of the Employer.

Buyer
Mid and East Antrim Borough Council
Date Published
Unknown
Status
Planned
Classification
71000000: Architectural, construction, engineering and inspection services
Value
Unknown
Procurement Method
""
Procurement Method Details
Unknown
Tender Deadline
Unknown
Contract Start Date
2025-01-23
Contract End Date
2025-01-23
Suitable For Sme
false
Suitable For Vcse
false
Documents
No documents found.