Water-Cooled Lithium Lead (WCLL) Loop: Design and Manufacture

09300000: Electricity, heating, solar and nuclear energy

Contract details

Detailed information about the contract

Id
T/PJP253/21
Title
Water-Cooled Lithium Lead (WCLL) Loop: Design and Manufacture
Description

The UK Government has given UKAEA the goal to maintain the UK’s position as a world leader in fusion research and development. As part of this the UKAEA Fusion Technology Facilities (FTF) is establishing a new facility at the Advanced Manufacturing Park (AMP) in Rotherham, Yorkshire. This facility considers the full development cycle from materials technology, to advanced manufacturing and joining, to component testing and will be the home to the Combined Heating and Magnetic Research Apparatus (CHIMERA) test facility. A future upgrade proposed for CHIMERA is the addition of a liquid lithium-lead (LiPb) circulation loop located within the existing high-field magnetic field (Figure 1). This upgrade would enable the capability for Water-Cooled LiPb (WCLL) Breeder Zone (BZ) testing under high magnetic field and flux after 2024 to enable heat transfer experiments at component scale but also aid fusion system design.

Buyer
United Kingdom Atomic Energy Authority
Date Published
Unknown
Status
Planned
Classification
09300000: Electricity, heating, solar and nuclear energy
Value
Unknown
Procurement Method
""
Procurement Method Details
Unknown
Tender Deadline
Unknown
Contract Start Date
2025-06-15
Contract End Date
2025-06-15
Suitable For Sme
false
Suitable For Vcse
false
Documents
No documents found.