45410000: Plastering work
Detailed information about the contract
or register for a free account
Work packages for the construction delivery services at Beacon Barracks for the Defence Estate Optimisation Portfolio. Lendlease are delivering works at Beacon Barracks on behalf of the Defence Infrastructure Organisation involving the reconfiguration and refurbishment of existing infrastructure and construction of new infrastructure to provide the MOD with improved Live/Work/Train requirements. High-level Scope of works: The supply and installation of drywall and ceiling elements to new build and refurbishment assets including plasterboard dry lining and plasterboard partitions, Ceilings, Soffits and Bulkheads, rigid sheet ceilings, rigid sheet linings. The works include all plasterboard ceilings, bulkheads and demountable ceiling tiles including all support framework and trims. The ceiling systems shall include all connecting any bridging clips, nuts and bolts, Sub Grid as required. Note: Dry lining / dry lined walls refers to all the forms of dry wall construction including shaft wall, independent walls, lining walls and fire encasements.
Additional information: Minimum Compliance Requirements Description 1: Lendlease Financial Performance and Accreditation requirements, Lendlease Global Minimum Requirements, Building Information Modelling requirements, BPSS
or register for a free account