42416100: Lifts
Detailed information about the contract
or register for a free account
The project comprises of the removal of original screw jack Banqueting lift in the Civic Centres banqueting hall and replacing with a new goods and stage lift incorporating new technology, safety features and drive systems. The new lift systems aesthetics must be sympathetic in matching the architecture, and in keeping with the original lift and banqueting hall flooring. Suitable replacement of roller shutter doors at basement level interlocked with lift system required. Full compliance with latest safety standards for accessible goods lift platform and relevant standards for and stage lift equipment must be met. All controls to be open protocol with parts openly available to competent persons with goods lifting platform and stage lift equipment experience. A serviceable life of 25 years is to be achieved with market leading robust components.
https://open-uk.org/
or register for a free account