Supply chain notice: Organic Rankine Cycle (ORC) System
45251100: Construction work for power plant
Contract details
Detailed information about the contract
- Id
- tender_480098/1444140
- Title
- Supply chain notice: Organic Rankine Cycle (ORC) System
- Description
- General Description Organic Rankine Cycle (ORC) system designed to generate electricity from low-temperature waste heat sources. It should be capable of operating continuously or intermittently with a CHP engine.
- Technical Specifications
Net Power Output: 200 - 400 kW per unit
Thermal Power Absorbed: 1000 - 4500 kW
Hot Water Temperature: Minimum 80°C
Working Media: Environmentally friendly, non-toxic, non-flammable
Control System: PLC system / MODBUS TCP
- Buyer
- Ministry of Defence
- Date Published
- Unknown
- Status
- Planned
- Classification
- 45251100: Construction work for power plant
- Value
- £3.5M GBP
- Procurement Method
- ""
- Procurement Method Details
- ""
- Tender Deadline
- Unknown
- Contract Start Date
- 2025-08-31
- Contract End Date
- 2026-08-31
- Suitable For Sme
- false
- Suitable For Vcse
- false
- Documents
- No documents found.