BATTERY ENERGY STORAGE INSTALLATION (BESS) - Multiple UK & Ireland Based

09330000: Solar energy

Contract details

Detailed information about the contract

Id
C4N89278941
Title
BATTERY ENERGY STORAGE INSTALLATION (BESS) - Multiple UK & Ireland Based
Description

Fluence Energy (A Siemens and AES Company) have an exciting BoP EPC project pipeline for 2025. Fluence are working with some fantastic new and existing customers, helping them to deliver comprehensive turnkey Battery Energy Storage Solutions (BESS).

  We are looking to contract with Balance of Plant (BoP) Civil and Electrical contractors to deliver an initial pipeline of 3 projects. All three projects are Turnkey and located within UK & Ireland. The Specific areas of these projects are in close proximity to: East Ayrshire (Scotland), Greater Manchester (England) and Dublin (Ireland).

  Typical BoP scope activities includes (but not limited to):

  Preliminaries:
  Project & Site Management
  Design & Engineering Management
  Electrical System Studies
  Site Setup

  Civil Works:
  Enabling Works
  Setting out and surveys
  HSE, site infrastructure and CDM compliance
  Temporary works requirements
  Establish Finished platform 
  Piling 
  Drainage works
  Ducting and troughing installation
  Installation of equipment bases 
  Control Room Installation 
  Equipment lifting 
  Landscaping

  Electrical Works:
  Lightning Protection, earthing, bonding
  Supply & install of switchboards
  Supply & Install cables including terminations
  Supply & Install Auxiliar Transformers
  Supply & Install Containerised Building/Control Room/s
  Control & Protection Panels & Wiring
  Supply & Install BESS External Lighting
  Supply & Install BESS CCTV System (optional)
  Supply & Install DC Systems (Containerised Building) (Optional)
  Installation of Fire Alarm Panels (including wiring )
  BESS - Offloading, Positioning & Installation of Battery Enclosures 
  BESS - Cooling Liquid filling of Battery Enclosures 
  BESS - Offloading, Positioning & Installation of Power Conversion Systems
  BESS - Offloading, Positioning & Installation of Core Transformers 
  BESS - Offloading, Positioning & Installation of Core Support Enclosures
  BESS - Offloading, Positioning & Installation of Core Auxiliary Power Panel 
  BESS - Supply & Installation of Cables in all Battery Nodes 
  BESS - Supply & Installation of Communication Cables
  BESS - Supply & Installation of Auxiliary Power Cables
  BESS - Supply & Installation of All Cables from BESS PEC Unit to IPP Customer Control Building
  BESS - Supply & Installation of Auxiliary F-Stop Cables
  BESS - Supply & Installation of Fire Alarm System Cables

  Test & Commissioning:
  Test & Commissioning Containerised Building (Switchgear, LV AC & DC, Fire, C&P and FO Cables)
  Quality Assurance Documentation
Buyer
Fluence Energy UK Ltd
Date Published
2025-01-07 - 15 days ago
Status
Active
Classification
09330000: Solar energy
Value
£10.0M GBP
Procurement Method
""
Procurement Method Details
""
Tender Deadline
2025-01-24 - in 2 days
Contract Start Date
2025-05-04
Contract End Date
2026-01-07
Suitable For Sme
true
Suitable For Vcse
false