MOx Fuel Line

45351000: Mechanical engineering installation works

Contract details

Detailed information about the contract

Id
NNLC123
Title
MOx Fuel Line
Description

The current Fuel Line located in National Nuclear Laboratory’s (NNL’s) Central Laboratory was designed and installed in the mid-2000’s in Area 400 to provide research and development (R&D) support to Sellafield Mixed Oxide (MOx) Plant (SMP), which utilised the Short Binderless Route (SBR) for producing MOx. However, the Fuel Line was never fully commissioned and has remained in a state of Care and Maintenance (C&M) since then. The intent is to re-purpose the above existing fuel line, whilst keeping certain elements embedded within the design. The scope of the works required is therefore to Design, Install and Commission the Fuel Line for future usage by the NDA.

Buyer
CTM Portal for the NDA Shared Services Alliance
Date Published
Unknown
Status
Planned
Classification
45351000: Mechanical engineering installation works
Value
£30.0M GBP
Procurement Method
""
Procurement Method Details
Unknown
Tender Deadline
Unknown
Contract Start Date
2025-01-23
Contract End Date
2025-01-23
Suitable For Sme
false
Suitable For Vcse
false
Documents
No documents found.