Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park

45233253: Surface work for footpaths

Contract details

Detailed information about the contract

Id
LVRPA2024/24
Title
Provision for Phased strip up and replacement of 36,000m2 of resin bonded Gold Top tarmac to Lee Valley owned areas on Queen Elizabeth Olympic Park
Description

The Queen Elizabeth Olympic Park was home to the 2012 London Olympic Games. The Lee Valley Regional Park Authority is now the proud owner of two of the venues based on the park: The Lee Valley VeloPark and The Lee Valley Hockey andTennis Centre. LVRPA owns an area of land that currently has around 36,000m2 of resin bonded ‘Gold Top’ surfacing. Much of the resin bonded surface is now showing signs of deterioration and requires stripping up and replacing. The substrate is mainly concrete laid to falls and the areas generally drain into Acco drainage channels. There are some additional areas of resin bound surfaces, but these are fairly small in terms of square metreage. The resin bound areas are porous and generally drain through holes drilled through the substrate into the ground below.

Buyer
Lee Valley Regional Park Authority
Date Published
Unknown
Status
Active
Classification
45233253: Surface work for footpaths
Value
£2.5M GBP
Procurement Method
Open
Procurement Method Details
Open procedure
Tender Deadline
2025-02-04 - in 12 days
Contract Start Date
2025-01-23
Contract End Date
2025-01-23
Suitable For Sme
false
Suitable For Vcse
false
Documents